Roadmap
Eight milestones, from the bench to a season afloat.
The board is fixed first. Everything else joins it.
- M1
Bench validated
The measurement chain calibrated against a reference; the real quiescent current measured.
- M2
First boards
Four-layer boards fabricated, assembled and brought up.
- M3
Firmware v1
Measurement, state of charge, remote reporting, watchdog.
- M4
Afloat
Node installed upstream of the main switch; a full season with the boat.
- M5
Through the winter
Telemetry kept through layup; the consumption budget held.
- M6
Open design
Schematic, scripts, bill of materials and calibration published.
- M7
Second sensor
Outboard charging current on the same bus, no extra cable.
- M8
Beyond energy
Attitude and wind nodes join the same network.